Skip to product information
Availability: In Stock

Long Lead-acid battery 12V 12AH

Product SKU: 12V-12AH
Rs.7,560

Safe Delivery

Quick & safe nation wide delivery

Easy Return

Hassle free return within 7 days

100% Original Product

Only genuine products, no compromises.

WhatsApp Inquiry

Specifications

Type Lead-acid Battery
Nominal Voltage 12V
Nominal Capacity 12Ah (at 20-hour rate)
Battery Type Sealed Lead-Acid (SLA), AGM
Connection Type 6.3 mm flat plug
Maintenance Maintenance-free, spill-proof
Cycle Life Approx. 200-300 cycles at 100% discharge
Internal Resistance ≤ 20 mΩ (fully charged)
Dimensions (L × W × H) Approx. 151 × 98 × 94 mm (may vary by manufacturer)
Weight Approx. 3.5-4 kg
Case Material ABS plastic (high-impact resistant and flame-retardant)
Charging Voltage (Cycle Use) 14.4 - 15.0V
Charging Voltage (Float Use) 13.5 - 13.8V
Max Discharge Current Typically 180A (5 sec)
Charge 0°C to 40°C
Discharge -20°C to 50°C
Storage -20°C to 40°C

Key Features

Sealed, spill-proof design for safe operation in any position
Long service life with deep discharge recovery capability
Low self-discharge rate (~3% per month at 25°C)
High energy density and stable performance
Vibration and shock resistant
Product Details Reviews Shipping & Returns User Manual

Long Lead-acid battery 12V 12AH


The Long Lead-Acid Battery 12V 12AH is a high-performance, maintenance-free, and rechargeable sealed lead-acid (SLA) battery designed for reliable power supply in various applications. It is built with Absorbent Glass Mat (AGM) technology, ensuring efficient energy storage, deep discharge recovery, and long service life. This battery is commonly used in backup power systems, emergency lighting, UPS (Uninterruptible Power Supply), alarm systems, mobility scooters, and solar power storage.
Long Lead Acid Battery Price in Pakistan
Long Lead-acid battery 12V 12AH
Looking to purchase Long Lead-acid battery 12V 12AH in bulk?
  • Purchase Item in Bulk Quantity
  • Get At Best Price For Your Business
No reviews yet. Be the first to review this product.

Shipping

We ship across Pakistan. Standard delivery takes 3–7 business days.

Returns

Easy 7-day return policy. Product must be unused and in original packaging.

📄
Download User Manual
Click here to download PDF

Keep Exploring This Brand

Navigate trends with data-driven rankings

All

Recently Viewed

Take another look at the items that caught your attention.