Skip to product information
Availability: In Stock

Long Lead-acid battery 12V 18AH

Product SKU: Lead-acid-battery-12V-18AH
Rs.11,760

Safe Delivery

Quick & safe nation wide delivery

Easy Return

Hassle free return within 7 days

100% Original Product

Only genuine products, no compromises.

WhatsApp Inquiry

Specifications

Type Lead-acid battery
Nominal Voltage 12V
Nominal Capacity 20 hour rate (0.9A to 10.50V) 18Ah
Nominal Capacity 10 hour rate (1.71A to 10.50V) 17.1Ah
Nominal Capacity 5 hour rate (3.06A to 10.20V) 15.3Ah
Nominal Capacity 1C rate (18A to 9.60V) 10.2Ah
Nominal Capacity 3C rate (54A to 9.60V) 7.2Ah
Weight Approx. 6.3kg (13.86Lbs.)
Internal Resistance Approx. 10 mΩ
Length 181+2-1mm (7.13+0.08-0.04 inches)
Width 76+2-1mm (2.99+0.08-0.04 inches) Height: 167+2-1mm (6.57+0.08-0.04 inches)
Overall Height 167+2-1mm (6.57+0.08-0.04 inches)
Maximum Discharge Current 270A for 5 seconds
Cycle use Charging Voltage 14.4V to 15.0V
Coefficient -5.0mV/℃/cell
Maximum Charging Current 5.4A
Standby use Float Charging Voltage 13.5V to 13.8V
Coefficient -3.0mV/℃/cell
Charge -15℃ (5℉) to 40℃ (104℉)
Discharge -15℃ (5℉) to 50℃ (122℉)
Storage -15℃ (5℉) to 40℃ (104℉)
Case Material Durable ABS UL94 HB (Flammability resistance of UL94 V-0 option available)
Terminal F1 or F2 (Faston Tab 187 or 250
Design Life 3-5 years

Key Features

Nominal Voltage 12V
Nominal Capacity 18Ah (20-hour rate)
Maximum Discharge Current 270A for 5 seconds
Charging Voltage 14.4V to 15.0V (Cycle use)
Float Charging Voltage 13.5V to 13.8V
Internal Resistance Approx. 10 mΩ
Operating Temperature Charge -15℃ to 40℃, Discharge -15℃ to 50℃
Designed for high-performance and long lifespan (3-5 years)
Case Material ABS UL94 HB with flammability resistance option (UL94 V-0)
Terminal F1 or F2 (Faston Tab 187 or 250)
Product Details Reviews Shipping & Returns User Manual

Long Lead-acid battery 12V 18AH


The Long 12V 18AH Lead-acid Battery is designed for high-performance applications, offering reliable power storage and delivery. This battery is ideal for use in various backup power systems, uninterruptible power supplies (UPS), emergency lighting, and security systems. With a robust 18Ah capacity, it ensures long-lasting performance and resilience. This sealed lead-acid battery provides excellent charge retention, is easy to maintain, and has a high discharge current capability of up to 270A for 5 seconds. It is suitable for both cycle and standby applications with optimal charging efficiency.
Long Lead-acid battery Price in Pakistan
Long Lead-acid battery 12V 18AH
Looking to purchase Long Lead-acid battery 12V 18AH in bulk?
  • Purchase Item in Bulk Quantity
  • Get At Best Price For Your Business
No reviews yet. Be the first to review this product.

Shipping

We ship across Pakistan. Standard delivery takes 3–7 business days.

Returns

Easy 7-day return policy. Product must be unused and in original packaging.

📄
Download User Manual
Click here to download PDF

Keep Exploring This Brand

Navigate trends with data-driven rankings

All

Recently Viewed

Take another look at the items that caught your attention.