Skip to product information
Availability: In Stock

Long Lead-acid battery 12V 1.2AH

Product SKU: 12V-1.2AH
Rs.2,100

Safe Delivery

Quick & safe nation wide delivery

Easy Return

Hassle free return within 7 days

100% Original Product

Only genuine products, no compromises.

WhatsApp Inquiry

Specifications

Type Lead-acid battery
Nominal Voltage 12V
Nominal Capacity 20 hour rate (0.06A to 10.50V) 1.2Ah
Nominal Capacity 10 hour rate (0.114A to 10.50V) 1.14Ah
Nominal Capacity 5 hour rate (0.204A to 10.20V) 1.02Ah
Nominal Capacity 1 C (1.2A to 9.60V) 0.68Ah
Nominal Capacity 3 C (3.6A to 9.60V) 0.48Ah
Weight Approx. 564g (1.24Lbs.)
Internal Resistance Approx. 75.4 mΩ
Maximum Discharge Current (5 seconds) 18A
Charging Methods Cycle use Charging Voltage 14.4 to 15.0V
Charging Methods Float use Charging Voltage 13.5 to 13.8V
Charging Methods Maximum Charging Current 0.36A
Charging Methods Coefficient for cycle use -5.0mV/℃/cell
Charging Methods Coefficient for standby use -3.0mV/℃/cell
Charge -15℃(5℉) to 40℃(104℉)
Discharge -15℃(5℉) to 50℃(122℉)
Storage -15℃(5℉) to 40℃(104℉)
Charge Retention (Shelf Life at 20℃/68℉) 1 month 92%
Charge Retention (Shelf Life at 20℃/68℉) 3 months 90%
Charge Retention (Shelf Life at 20℃/68℉) 6 months 80%
Case Material ABS UL94 HB
Design Life 3-5 years
Terminal Type F1 or F2 (Faston Tab 187 or 250)
Length 97±1mm (3.82±0.04 inches)
Width 43±1mm (1.69±0.04 inches)
Height 53±1mm (2.09±0.04 inches)
Overall Height 59±1mm (2.32±0.04 inches)

Key Features

12V nominal voltage
1.2Ah capacity (20-hour rate)
Compact and lightweight design
Internal resistance of approx. 75.4 mΩ
Maximum discharge current of 18A (5 seconds)
Wide operating temperature range: -15℃ to 50℃
Float charging voltage: 13.5V to 13.8V
Ideal for backup power, emergency lighting, and security systems
Long shelf life with up to 92% charge retention after 1 month
Durable ABS case material (UL94 HB)
Design life of 3-5 yearsCompatible with F1 or F2 terminals (Faston Tab 187 or
250)
Product Details Reviews Shipping & Returns User Manual

Long Lead-acid battery 12V 1.2AH


The Long 12V 1.2AH Lead-acid battery is a high-performance, reliable energy solution designed for various applications, including backup power, emergency lighting, and security systems. This battery offers an optimal balance of capacity, durability, and efficiency, ensuring long-lasting and stable performance. With its compact size, it is perfect for devices requiring stable power over extended periods. The battery features advanced charge retention capabilities, low self-discharge rate, and operates within a wide range of temperatures.
Long Dry Maintenance Battery Price in Pakistan
Long Lead-acid battery 12V 1.2AH
Looking to purchase Long Lead-acid battery 12V 1.2AH in bulk?
  • Purchase Item in Bulk Quantity
  • Get At Best Price For Your Business
No reviews yet. Be the first to review this product.

Shipping

We ship across Pakistan. Standard delivery takes 3–7 business days.

Returns

Easy 7-day return policy. Product must be unused and in original packaging.

📄
Download User Manual
Click here to download PDF

Keep Exploring This Brand

Navigate trends with data-driven rankings

All

Recently Viewed

Take another look at the items that caught your attention.